01

Listen to you

Design proposal with costing on the basis of requirements.
02

Site visit

Explanation of proposal on site meeting
03

Start Design

Measurement Of the site and preparing the designs on the basis of designer’s meeting At site
04

Revise the design

Design alteration as per taste and final the volume design on sketch up model
05

Choose the Palette

Finalize the exposed finishes and color, send it to 3D render views
06

Sign Off

Sign off on final designs and send it to procurement and production
07

Take the key

Handover with deep cleaning
Design Your Nest's

Schedule of Work

STEP 01 - AFTER 10% OF THE PAYMENT - NON REFUNDABLE

  1. We will do the measurement of the site, and prepare the sketch model in google sketch up. It will take three working days.
  2. We will prepare one concept modd board through already completed projects to understand in details about your aspiration. It will take one working day.
  3. We will work on the model to install furniture as per your requirements (design your dream home), then do the first design presentation to you in our office. It will take three working days.
  4. Selection of exposed material and other artifacts, furniture and furnishings.
  5. Send to 3d rendering
  6. Prepare the production drawings with details of internal and external structure and finishes along with costing sheet.

STEP 02 - AFTER 55% OF THE PAYMENT - NON REFUNDABLE

  1. We will cover the flooring through corrogated sheet for protection of flooring
  2. Electrical modification, civil modification, plumbing modification - has to be completed
  3. False ceiling work has to be completed
  4. Painters has to finish putty and primer work
  5. Mean while carpenters will be working in the factory - laminate pressing, cutting, edge banding and joinery of smaller units.

STEP 03 - AFTER 30% OF THE PAYMENT - NON REFUNDABLE

  1. Dispatch the material at site - (wood work)
  2. Carpenter will finish their work
  3. Electrician will fix all the switches and lights
  4. Painters will cover all the units
  5. Finish the painting
  6. Deep cleaning will be done by painters

STEP 04 - AFTER 5% OF THE PAYMENT - NON REFUNDABLE

  1. Handover will be done with cake cutting.
  2. Handover the warranty documents, keys and handover kit
  3. We will take sign on handover document after checking each n everything and if there is any snags then we will give you committed time to complete the snags.

Design Your Nest's

Schedule of Work

STEP 01 - AFTER 10% OF THE PAYMENT - NON REFUNDABLE

  1. We will do the measurement of the site, and prepare the sketch model in google sketch up. It will take three working days.
  2. We will prepare one concept modd board through already completed projects to understand in details about your aspiration. It will take one working day.
  3. We will work on the model to install furniture as per your requirements (design your dream home), then do the first design presentation to you in our office. It will take three working days.
  4. Selection of exposed material and other artifacts, furniture and furnishings.
  5. Send to 3d rendering
  6. Prepare the production drawings with details of internal and external structure and finishes along with costing sheet.

STEP 02 - AFTER 55% OF THE PAYMENT - NON REFUNDABLE

  1. We will cover the flooring through corrogated sheet for protection of flooring
  2. Electrical modification, civil modification, plumbing modification - has to be completed
  3. False ceiling work has to be completed
  4. Painters has to finish putty and primer work
  5. Mean while carpenters will be working in the factory - laminate pressing, cutting, edge banding and joinery of smaller units.

STEP 03 - AFTER 30% OF THE PAYMENT - NON REFUNDABLE

  1. Dispatch the material at site - (wood work)
  2. Carpenter will finish their work
  3. Electrician will fix all the switches and lights
  4. Painters will cover all the units
  5. Finish the painting
  6. Deep cleaning will be done by painters

STEP 04 - AFTER 5% OF THE PAYMENT - NON REFUNDABLE

  1. Handover will be done with cake cutting.
  2. Handover the warranty documents, keys and handover kit
  3. We will take sign on handover document after checking each n everything and if there is any snags then we will give you committed time to complete the snags.